Thanks guys, went slowly with the letterbox idea from inside to get a pilot hole, then outside to finish up.
All worked nicely - now just need to get some beer on!
Search found 3 matches
- Sun Jul 26, 2020 4:16 pm
- Forum: Brewing Equipment
- Topic: Kegerator build - dreaded hole drilling
- Replies: 10
- Views: 4390
- Sat Jul 25, 2020 11:04 am
- Forum: Brewing Equipment
- Topic: Kegerator build - dreaded hole drilling
- Replies: 10
- Views: 4390
Re: Kegerator build - dreaded hole drilling
Thanks, do you have any pictures? I thought about going through the metal with a dremel but thought I’d have more control with a knife?
Just custom build the cabinet and bar to fit the fridge, now feeling the pressure of drilling the fridge correctly.
Just custom build the cabinet and bar to fit the fridge, now feeling the pressure of drilling the fridge correctly.
- Sat Jul 25, 2020 8:22 am
- Forum: Brewing Equipment
- Topic: Kegerator build - dreaded hole drilling
- Replies: 10
- Views: 4390
Kegerator build - dreaded hole drilling
Hi Guys I have a Hotpoint RLA30, and need two holes drilling through for beer lines and Co2. Obviously wary about drilling the holes through, but have another idea and wanted any advice or if it’s been done before successfully. I can’t find anywhere online that has a coolant line diagram for this mo...