didnt have any stuck sparges so all is good.
the boiler is on now. just waiting for the hot break and all systems go.

The first runnings after recycling being fed through a pipe so as not to splash/airate

clear runnings. although slight hiccup, the tubing popped off. had to use the back of my spoon to stop the splashing.

all done and in the boiler
