
Also added 5g of gypsum to the mash and 5g calcium chloride. 1st outing into the land of water treatment so hope it will be beneficial


So I was aiming for 20L @ OG 1.058
60 min mash, 90 min boil

MO, Crystal, Flaked Barley, Chocolate malt, Wheat malt, and Roasted Barley

Mashed in. Hit the mash temp bang on. Although I do have t get a new digital thermometer now as I dropped mine into the full HLT


It wasn't water proof


After 60 mins and the first sparge water. Starting to look like a good coffee already



Got a really good sparge going again. I think in the past I have been pushing the manifold onto the tube at the back of the tap too much, as it has a bit of give. This must have been the reason behind my slow sparges in the early days.

Bought some pH strips to test my mash pH for the 1st time. Totally forgot to use them untill the second sparge




The hop additions. 50g Fuggles on the left, 30g Goldings + Protofloc tab on the right

1.041 @ 45oC = 1.049 @ 20oC. Was aiming for 28L @ 1.045 and got 27L @ 1.049

boil hops going in


Cooling

Collection. Ended up with 19.5L @ 1.056 so a bit under the mark but only a touch.

All in all it was a good brew day. Tucked up in the spare room at 20 deg c.