Tallys Brewery in progress.

The forum for discussing all kinds of brewing paraphernalia.
User avatar
Talisman
Lost in an Alcoholic Haze
Posts: 673
Joined: Mon Apr 21, 2008 4:22 pm
Location: Grimsby, N.E.Lincs, UK
Contact:

Re: Tallys Brewery in progress.

Post by Talisman » Mon Dec 08, 2008 8:47 pm

More progress. After getting it setup i then could start looking at how to feed it all about. So after a few changes and loads of plastic pipework and fittings her she goes.

Image

Image

Fermenter (FV) with Sight Tube.
Image

Hot Liquid Tank (HLT) with Sight Tube.
Image

Image

March May 809 Pump.
Image

Mash Tun With Home Made Sparge Arm
Image

And with Mash Bed Filter
Image

Mash Tun Gravity Feeds Direct into Boiler.
Image

Isolator Heaven.... or Hell? :shock:
Image

Image

With it Being on an island thought id better sort out a way to drain it all for cleaning etc.
With it being Plastic Fittings they are movable/swivel. So put the drain on an elbow.
Image

Then on a long arm that moves into an upright position clipped to the centre piece.
Image

Un clip it and swing it down.
Image

Bingo one drain into the sink.
Image

Image.

Next is to test it all. Found i have a small leak on the HLT where the socket is welded to the barrel, so need to weld over the top of it to seal it. Hopefully get it done in the week.
Black Lab Ale - est April 2008
FV 1: Old Spec Hen FG1053
FV 2: Empty
Cornie 1: Empty
Cornie 2: Empty
Cornie 3: Empty
Cornie 4: Empty
Cornie 5: Empty
Bottled: Nowt
http://www.blacklabale.co.uk

adm

Re: Tallys Brewery in progress.

Post by adm » Mon Dec 08, 2008 9:10 pm

Looking good.

I love that plastic piping - it's just so damn easy to work with compared to copper.

greenbank brewer

Re: Tallys Brewery in progress.

Post by greenbank brewer » Tue Dec 09, 2008 8:41 am

Looks fantastic Talisman great job and thanks for all the great pictures.

gb

HG

Re: Tallys Brewery in progress.

Post by HG » Tue Dec 09, 2008 9:17 am

that's a damn good looking set up

User avatar
mixbrewery
Drunk as a Skunk
Posts: 831
Joined: Mon May 21, 2007 7:48 pm
Location: Hemel
Contact:

Re: Tallys Brewery in progress.

Post by mixbrewery » Tue Dec 09, 2008 2:42 pm

Well done there, looking good!
Cracking job if you've only found one leak with that many joints. =D>
Check out the beers we have for sale @ Mix Brewery

User avatar
Talisman
Lost in an Alcoholic Haze
Posts: 673
Joined: Mon Apr 21, 2008 4:22 pm
Location: Grimsby, N.E.Lincs, UK
Contact:

Re: Tallys Brewery in progress.

Post by Talisman » Tue Dec 09, 2008 11:19 pm

aye thanks lads
Black Lab Ale - est April 2008
FV 1: Old Spec Hen FG1053
FV 2: Empty
Cornie 1: Empty
Cornie 2: Empty
Cornie 3: Empty
Cornie 4: Empty
Cornie 5: Empty
Bottled: Nowt
http://www.blacklabale.co.uk

User avatar
StrangeBrew
Under the Table
Posts: 1046
Joined: Sun Nov 12, 2006 7:07 pm
Location: A shed in Kent

Re: Tallys Brewery in progress.

Post by StrangeBrew » Tue Dec 09, 2008 11:44 pm

Excellent post Tally! =D>

Don't you just love mucking around with this stuff?! It's all part of the fun...absolutely love it!
Drinking it is the end result but building and brewing gives just as much satisfaction.

User avatar
Talisman
Lost in an Alcoholic Haze
Posts: 673
Joined: Mon Apr 21, 2008 4:22 pm
Location: Grimsby, N.E.Lincs, UK
Contact:

Re: Tallys Brewery in progress.

Post by Talisman » Wed Dec 10, 2008 9:12 am

yeah ive really enjoyed it, just cant wait to make my first brew in it as im bound to cock it up first time lol. or throw the wrong lever the wrong way....
Black Lab Ale - est April 2008
FV 1: Old Spec Hen FG1053
FV 2: Empty
Cornie 1: Empty
Cornie 2: Empty
Cornie 3: Empty
Cornie 4: Empty
Cornie 5: Empty
Bottled: Nowt
http://www.blacklabale.co.uk

softlad

Re: Tallys Brewery in progress.

Post by softlad » Wed Dec 10, 2008 12:15 pm

I dont know if I'm more impressed with the plumbing or the fact that you could clear space in your garage to build the setup

User avatar
Talisman
Lost in an Alcoholic Haze
Posts: 673
Joined: Mon Apr 21, 2008 4:22 pm
Location: Grimsby, N.E.Lincs, UK
Contact:

Re: Tallys Brewery in progress.

Post by Talisman » Mon Feb 23, 2009 9:19 am

Well made more progress finally. After getting ready to make a brew a couple of weeks ago found the HLT socket still bloody leaked. Got it re braised. put the element in and tightened it up. crack.. braise failed again...

sod it. bouught another 2 1/4" stainless socket and got my mate to cut 2 new holes nearerthe bottom of the keg. sliced the socket in half and welded these two in. whacked out the old braised socket and plated over it.

Now im back were i started ready to roll again.

Ive wrapped the HLT, MT, and FV in some bubble wrap and then wrapped 3 camping mats around each one for insulation.

Now just adapting a bit of the electrics (only planned 1 element for the HLT now it has 2 :lol: ) then a test run and beer making time again.
Black Lab Ale - est April 2008
FV 1: Old Spec Hen FG1053
FV 2: Empty
Cornie 1: Empty
Cornie 2: Empty
Cornie 3: Empty
Cornie 4: Empty
Cornie 5: Empty
Bottled: Nowt
http://www.blacklabale.co.uk

subsub

Re: Tallys Brewery in progress.

Post by subsub » Mon Feb 23, 2009 12:11 pm

Hope it all goes well for you on your test run. Nice pix too :D

User avatar
Talisman
Lost in an Alcoholic Haze
Posts: 673
Joined: Mon Apr 21, 2008 4:22 pm
Location: Grimsby, N.E.Lincs, UK
Contact:

Re: Tallys Brewery in progress.

Post by Talisman » Wed Feb 25, 2009 8:59 am

nearly there. had a play last night, got the electrics sorted. half filled the hlt (no leaks =D> ) heated the water up and then tried to pump from it to the MT.

Nothing happened. Pump ran but no pumpy pumpy...

When i got the MarchMay pump it said you could turn the head 180* (so the in and out were opposite ways) which i did. Turning it back the way it came made the pump actually do what it says on the tin.

So after re jigging it again, got the water from the HLT being pumped about.

Will have another session tonight in prep for a brew on Sat. Cant bloody wait hehe
Black Lab Ale - est April 2008
FV 1: Old Spec Hen FG1053
FV 2: Empty
Cornie 1: Empty
Cornie 2: Empty
Cornie 3: Empty
Cornie 4: Empty
Cornie 5: Empty
Bottled: Nowt
http://www.blacklabale.co.uk

Chappie519

Re: Tallys Brewery in progress.

Post by Chappie519 » Wed Feb 25, 2009 5:54 pm

Brewery looks excellent Tally! Great pictues too! Hope all goes well for saturday - looking fwd to the piccies! :D

User avatar
Talisman
Lost in an Alcoholic Haze
Posts: 673
Joined: Mon Apr 21, 2008 4:22 pm
Location: Grimsby, N.E.Lincs, UK
Contact:

Re: Tallys Brewery in progress.

Post by Talisman » Thu Feb 26, 2009 9:12 am

More playing last night. Now everything pumps the right way, the sparge arm wasnt working right as something was stopping it spining. took it to bits and messed about with it and now that works too.

Pics of it all insulated up and now ready to run.

Image

Image

Image

Image

Image

And What brewery is finished unless it has a logo..

Image

:wink:

oh just remembered.... havent looked at my cooler yet... wonder if that fits in these kegs..... #-o
Black Lab Ale - est April 2008
FV 1: Old Spec Hen FG1053
FV 2: Empty
Cornie 1: Empty
Cornie 2: Empty
Cornie 3: Empty
Cornie 4: Empty
Cornie 5: Empty
Bottled: Nowt
http://www.blacklabale.co.uk

garwatts

Re: Tallys Brewery in progress.

Post by garwatts » Thu Feb 26, 2009 10:15 am

Wow :boff:
When do the brewery tours start? :)

Post Reply