
Moving from a gravity setup to a one level pumped system (with my new pump, courtesy of Norm). I spent most of yesterday making a manifold to control the flow or liquids from HLT to MT, MT to Boiler and then Boiler to (hopback*) then Chiller and on to FV.
First off today, whilst cleaning and sanitising the system, I discover that the pump is too powerful and I have insufficient in-flow to keep the pump "wet" and therefore lubricated and primed. (Well the new manifold was pretty, even if it is now obselete)

Well we have to brew (don't we !) so I set about bodging things together so I can get through the day. Aiming to have pumping from HLT to MT first for filling and then sparging. Oh dear - The fairies have absconded with my sparging head !
whilst sparging with the hose pipe garden spray fitting

Next, a stuck sparge, so I stir it all up and manage to get the second half out of the MT and into a bucket. (remember the pump is sitting idle at this time !). Next we are lifting the full bucket to shoulder height and tipping it into the boiler, never a good idea, however it went off without a hitch.
After getting the brew up to temperature, I forgot to start the timer for the boil . . . .

That's it for now, the boil has another 38 mins, give or take 10 mins
sorry, just had to vent some steam

* planned addition