Post
by daveyk » Thu Dec 11, 2008 12:07 am
The method I used was a mixture between the instructions supplied, the method for a Brupaks kit and a couple of questions answered / tips offered on the forum…. Here goes.
I WILL TRY AND ANSWER THE SPECIFIC QUESTIONS WHEN I HAVE A MOMENT.
It goes without saying EVERYTHING that comes into contact with ANY ingredient needs to be sterilised.
All water I used was el cheapo from Sainburys… Caladonian spring.
Stand can in hot water to soften the contents. (for at least 5 mins approx).
Rehydrate yeast in about 150 – 200ml of water. Check the temp of this water BEFORE adding the yeast, it should be in the temp range stated for the yeast to ferment. (apparently too hot or too cold and the yeast will die). After about 15 mins the yeast should be puffed up and milky.
In the mean time, open the can and tip the contents into the fermenting vessel (FV).
Add the hop pellets to the can and top up with boiling water…. Leave for 15 mins.
Add another kettle full of boiling water to the FV… stir to dissolve the liquid extract.
After the 15mins in the can, add the water from the can into the FV. (careful it’s very hot to pick up!) I strained the hops with a sieve so they don’t actually go in the brew….. the flavour should be in the water.
Stir up the contents of the FV to make sure it is all mixed in. Start adding the bottled water to make upto the 25 litres.
My method was to fill the FV to approx two thirds, then start adding the spray malt. (this keeps the temp down)
This is a bit of a chew on…. Tips are, big spoon in one hand, pint of the last brew on hand, CD if required then stir like mad, slowly adding the spray malt. Keep going until the bag is empty and all the lumps are gone. I always end up with a good head on the brew… apparently this is good to aid the fermentation but bad for seeing if the lumps are gone.
Top up to the required volume.
Check the temp and pitch the yeast.
Ferment as normal.
I’ve done this brew twice…. Not sure what the starting gravity was the first time but it was 1038 the second. It finished fermenting at 1013 after 15 days the first time and 1015 after 10days the second.
AND NOW FOR THE HONEY!!! I managed to find a local bee keeper for some local made honey.... therefore boiling is necessary.
Once you are happy the fermenting has finished it is time for bottling. For the full 40pt brew, I added 448g (nearly 1 jar) of honey to a saucepan, added as little water as possible to make a solution, (100ml or so) and boiled for 3-5mins. Ensuring this is dissolved, added to a second FV.
Drain off beer from 1st FV into second then bottle, add caps.
Keep beer in warm, (room temp) place for 1week to 10 days.
Move to garage for 4weeks min…. was best after 8 weeks.