Continuing to tweak the system and my process. One flaw with my hot liquor tank is that to mount the lower element on a truly flat surface i ended up with 10ltrs of water below the lower element. As we all know, heat rises so i have been draining the colder 10 ltrs and taking temp readings of the draining liquor prior to diverting it into the mash tun and underletting. Its a PITA and its not elegant so i've made myself a long stirring paddle. Its not particularly elegant itself but it is shiny and it is made of aluminium and i really enjoyed making it. Only weighs a few Oz's! Under the handle its been wound with paracord and then heatshrunk on top. Should keep the handle isolated from burning me as it heats up.
Running total
stainless copper £96 incl delivery(Sept 2009)
igloo mash tun £110 incl delivery
conical fermenter £92 incl delivery
3 of 3mtr lengths 22mm copper pipe £20
Various copper fitting for manifold builds £20
Carbon steel flatbar & 25mm box section for fermenter tri leg stand stand(incl 4 adjustable feet)£16
SIlver paint,drill bits and bolts for above £25
Stainless 1" ball valve £10
2 of 80 ltr HDPE containers c/w lids £26
Temp kettle valve and hop filter fittings £20
Various fittings for mash tun and kettle connection £30
Stainless filter mesh £8
3 of Speck fluid pumps £129
SOLD 2 of pressure barrels
Barrel funds purchased 24V variable power supply to control the Speck pumps and a inline water flow meter so i can monitor volume used.
22mm end cap
2 of 2mm drill bits
wand mounting clips
Cutting disc £5
Paint £10
30mm box section 14mtrs,end plugs and adjustable feet for brewstand and overback mounting bracket £38
Pump control switches £4.20
Plastic box for transformer and switches(pump control) £12
Rubber grommets for sealing cables in JB £2.20
1/4 turn pump throttle valves and various related fittings(pump flow control) £20
soldering of and supply of 2.5 mtr twin core onto each of three pump switches £5!
4 big steel rawlbolts & 4 brass hooks to stop me killing myself with the overback £10
More fittings and a few bolts £14
Yet more fittings to get a brew on and Damn the RAF finish! £30(Oct 2009
1st Brew)
Sight level gauge kit £30(March 2010)
2 tescos cheap kettles and a holesaw for the elements £16
1 of 22mm gate valve, various yorkshire fitting. £12
Copper for cooler £0 as it was 'in stock in the shed from a house project'.(April 2010)
New Hop Filter £0, parts in the plumbing box.(May 2010
8th Brew)
Large aluminium spoon of stirring £0 aluminium from a previous project.(June 2010)
To date £816