barneey wrote:Just noticed on your labels you dont have a "thingamabob" label?
Or the essential don't panic tag
I'm not putting a seperate led in for the alarm as the buzzer i bought has a red led built into it.
I was going to go down the route of keeping ac out for the pumps and building a seperate enclosure for a solar pump controls but i like what you have done. The problem i may have if i start adding extras is it might get a bit tight in my enclosure (400x400x200). I suppose there is space where the brewery logo is meant to go and i only plan on having 2 pumps anyway.
.....mind made up, two more small blue volt meters to buy from China. I think i might try and hunt down a knob which is a bit chunkier and around the same size as the pilot light.
The only main thing i'm waiting for now is a timer which i've just ordered today. The omega one that was linked in the electric brewery site was well out of the price range i was looking at spending. I think i've ordered the same or a similar one as you (the Sestos one which was linked earlier in this thread) which was much more sensibly priced and has the same colour display as the pids i'm using. Hopefully it will slip through customs as it is over the £15 limit.
You are way ahead of me as i'm yet to cut a hole. Do the pilot leds fit into a 21mm hole or would it be a bit too tight? I have a 21 tct cutter in my toolbox left over from the ongoing brewery rebuild so i was hoping to use that.
Did you decide on what relays to use? I ended up on this for the main input
http://www.ebay.co.uk/itm/1pc-JQX-40F-2 ... 23122f0229 as i'm having a 32a rated input feed and this for the other relays
http://www.ebay.co.uk/itm/270772329323? ... 26_rdc%3D1.