The 680 litre HLT. All i have done o this so far is weld a 2 1/4 element socket and connections for a sight glass. It will have a 9kw element fitted and be insulated and wood clad.

The 530 litre mash tun. This has had a the top removed and a stainless, flat-bar cross welded into the bottom to support the false bottom. Again this will be insulated and wood clad and have a new lid fabricated for it.

The 680 litre brew kettle. This has also had the top removed. It has three 2 1/4 sockets welded in for three 6 kw elements. Yet again it will be insulated and wood clad.
All will need a lot of polishing too before being clad etc. Hope fully be up and running in a month or two!