Stainless Boiler - 3kW Immersion elements

The forum for discussing all kinds of brewing paraphernalia.
Post Reply
CarpHunter

Post by CarpHunter » Sat Apr 05, 2008 9:14 am

cockneyron wrote:Carphunter excuse my ignorance :oops:
Whats "body camoflage"
Its not ignorance at all, I had not heard of it before my daughter chose go into it as a business, body camoflage is the covering of scars and birth marks, and some birth defects things like making false ears etc.

sparky Paul

Post by sparky Paul » Sat Apr 05, 2008 10:14 am

CarpHunter wrote:
cockneyron wrote:Carphunter excuse my ignorance :oops:
Whats "body camoflage"
Its not ignorance at all, I had not heard of it before my daughter chose go into it as a business, body camoflage is the covering of scars and birth marks, and some birth defects things like making false ears etc.
I don't think I would have known what 'body camouflage' was either. What a great thing to do. 8)

User avatar
Garth
Falling off the Barstool
Posts: 3565
Joined: Tue Aug 22, 2006 1:00 pm
Location: Durham

Post by Garth » Wed Apr 16, 2008 4:28 pm

Following on from some excellent advice on this thread especially from Sparky Paul, I've been busy today in the garage doing some wiring to power the HLT and boiler. I would have liked some of that thick white plastic on the walls first, the sort you get in food prep areas, but I can do that at a later date.

The HLT and boiler each will have 2 x 3Kw immersion heaters in them so there are four 16A sockets. They are being fed by a separate consumer unit with RCD and two 32A MCBs. This in turn is fed from the main fuse box. I have some heat resistant cable to go from the 16A sockets to the heaters themselves. They will later be wired into some sort of control panel with double pole switches, probably 4 cooker type switches or something.

Next job is to get those elements fitted into the boiler.

Image

buzzrtbi

Post by buzzrtbi » Wed Apr 16, 2008 4:37 pm

that looks spot on :lol:

you were lucky you were so close to the main supply.

I had to create a whole new ring. :cry:

User avatar
Garth
Falling off the Barstool
Posts: 3565
Joined: Tue Aug 22, 2006 1:00 pm
Location: Durham

Post by Garth » Thu Apr 17, 2008 9:02 am

exactly, fusebox and water tap on the same wall, what more could you ask

Scooby

Post by Scooby » Thu Apr 17, 2008 10:16 am

It all looks very nice indeed Garth, brewing in an organised environment is much more enjoyable.

I like your ss boiler, I've been looking for a 50l, nordic-optical's 50l ones seem to have dried up at the moment.

Where did you source yours from, perhaps they may have a smaller version?

User avatar
Garth
Falling off the Barstool
Posts: 3565
Joined: Tue Aug 22, 2006 1:00 pm
Location: Durham

Post by Garth » Thu Apr 17, 2008 1:38 pm

Cheers Scoob,

Mine came from H&G, it's some Italian manufacturer which wasn't listedon the site. I know he does 50 litre ones from various suppliers, Brupaks being one of them. They tend to be a bit more expensive than Nordic though. When he saw my Nordic thermobox to measure it for a false bottom, he said it looked well made and couldn't understand how they are so cheap. I agree, especially now with most metals, namely stainless/copper going through the roof.

Scooby

Post by Scooby » Thu Apr 17, 2008 4:45 pm

Thanks for that Garth, I've called everyone else and was waiting for them to return from hols to ring them.

The thermo boxes are excellent value and good quality, I think i could justify spending a bit more on a boiler
having already saved on the thermo box. :whistle:

But will that reasoning stand up to interrogation? :lol:

Edit. When they start coming from China and not Italy they will be cheaper :!:

buzzrtbi

Post by buzzrtbi » Wed Apr 23, 2008 2:13 pm

Garth wrote:exactly, fusebox and water tap on the same wall, what more could you ask
have you fired them up yet Garth? mine are all wired up now but not tried them. used some immersion tails from toolstation into the same 16A connectors that you have used. I have sealed the connection with instant gasket to ensure no liquids find a way in. it is also heat resistant !

firing the beast up on Sunday hopefully. if your lights go dim in the West Country you know why. I have warned the National Grid to have more Power Stations and Gas Turbines on standby ready to catch the frequency dip :lol:

User avatar
Garth
Falling off the Barstool
Posts: 3565
Joined: Tue Aug 22, 2006 1:00 pm
Location: Durham

Post by Garth » Thu Apr 24, 2008 4:58 pm

nope, not yet buzzrtbi, have a tiny bit more wiring to do that Saprky Paul suggested and then I need another holesaw for the second element as even though I cooled it while cutting I've still blunted the first one. :(

adding a sight tube on the side in a moment

what did you use as the sealant around the element wire cover?

buzzrtbi

Post by buzzrtbi » Thu Apr 24, 2008 6:05 pm

Garth wrote:nope, not yet buzzrtbi, have a tiny bit more wiring to do that Saprky Paul suggested and then I need another holesaw for the second element as even though I cooled it while cutting I've still blunted the first one. :(

adding a sight tube on the side in a moment

what did you use as the sealant around the element wire cover?
it is some grey instant gasket from Halfords. it is effectively a high temperature silicone that you use on car engines as manifold gasket etc. I figured that if it can withstand the heat and pressure from a car engine it is more than up to the job of keeping the odd splash of boiling wort.

there are lots available - cost about £4. do you want the make?

what additional did Sparky Paul recommend?

Giovanni

Re: Stainless Boiler - 3kW Immersion elements

Post by Giovanni » Tue Apr 29, 2008 1:08 am

They are stainless steel, not copper, nickel or incalloy so they should last a while, also they come with the elusive backnut which I've had trouble finding, although it's brass and I would have preferred ss.

any thoughts, comments?
Yes, Stainless welds itself to other stainless, it even repairs scratches and such on it's surface. When unscrewing you will break the backnut from the whatever stainless it is touching - called galling. This is why backnuts and washers are fitted with different material. You should be happy with the brass ;-p

Giovanni[/quote]

User avatar
Aleman
It's definitely Lock In Time
Posts: 6132
Joined: Sun Jun 03, 2007 11:56 am
Location: Mashing In Blackpool, Lancashire, UK

Post by Aleman » Tue Apr 29, 2008 8:32 am

Garth wrote:The HLT and boiler each will have 2 x 3Kw immersion heaters in them so there are four 16A sockets. <snip> I have some heat resistant cable to go from the 16A sockets to the heaters themselves.
I/m looking at fitting out my Femtobrewery with these connectors, where did yours come from and how much were they? B&Q / RS / CPC want silly prices for them. Ebay is looking OK ish . . . . Ideally though some 16A Kettle type connectors would be my preferred option as they are so much smaller than Commando connectors

User avatar
johnmac
Under the Table
Posts: 1357
Joined: Fri Jan 27, 2006 6:00 pm
Location: Shropshire

Post by johnmac » Tue Apr 29, 2008 10:07 am

www.screwfix.com and search for 16A

buzzrtbi

Post by buzzrtbi » Tue Apr 29, 2008 10:37 am

think they are cheaper? in Toolstation

http://www.toolstation.com/shop/Electri ... 190/sd2430

get the wall mounted connectors (blue) like Garth has in his pics. while you are at it you can get 4 x immersion heater cables only a couple of quid each. note the length though - may not be long enough for your requirements?

Post Reply